During August the brickwork on the belltower was completed.  The screening was placed behind the crosses to protect the belltower and bells.  Bells arrived in mid September and will be installed in mid October.

 

The final 33 wells were dug in August.  The first wells were already operating, cooling the church. The drilling extended into the driveway and access to the Sunday Masses was helped by golf cart and wheelchair rides for the handicapped.
Well Drilling was completed and some drain pipes were also installed along the drive in front of the main entrance to the church.