August 2002 Building Pictures Page Two
![]() |
![]() |
| Finish work on the windows during August. | Workers applying a roofing material and seal to windows. These windows will remain clear. |
![]() |
![]() |
| The guttering and protective layer for the eaves were installed in August and September. | The eaves are covered with an off-white protective layer. |
![]() |
![]() |
| The steps to the Jr Hi Entrance were built. | A sidewalk was extended to the entrance. |
![]() |
![]() |
| The wall behind the church was built and it hides the utility box. | The view from Tomahawk shows how well the wall blends with the building and hides the utility box. |
Home Page + September 2002 Pictures