August 2002 Building Pictures       Page Two

Finish work on the windows during August. Workers applying a roofing material and seal to windows.  These windows will remain clear.
The guttering and protective layer for the eaves were installed in August and September. The eaves are covered with an off-white protective layer.
The steps to the Jr Hi Entrance were built. A sidewalk was extended to the entrance.
The wall behind the church was built and it hides the utility box. The view from Tomahawk shows how well the wall blends with the building and hides the utility box.

Home Page   +   September 2002 Pictures