June 2002 Building Pictures Page Two
![]() |
![]() |
| Upper view of bell tower | Building scaffolding for bell tower |
![]() |
![]() |
| Scaffolding for bell tower | Altar area. Note that mechanical area is no longer visible. Bricking has been done. Scaffolding is being removed so that wood can be installed on ceiling. |
![]() |
![]() |
| Altar area. A low flower wall has yet to be built and the window installed. |
Ceiling area with much of dry wall completed. Area with wood slats will have wooden beams. Gables will be dry walled. |
![]() |
![]() |
| Area to left of altar window, scaffolding coming down. | Plumbing work on baptismal font. |