November 2002 Building Pictures   Page Two

View of the back of church.  Note that the large lights on the upper ceiling have been installed. This is the view towards the east niche.  This wall will hold the other seven Stations of the Cross.
The view of the ceiling lights. This canopy covers the baptismal font.  It is still under construction.
A view of the canopy from the main aisle.  The baptismal font is still under construction and several pieces had to be reconstructed. This is a view of the outside of the Baptismal Font area.  The woodwork is beautiful and stained.  The windows have not been installed here yet (as of Nov. 14) although the windows have been installed in the doors, the nursery and the library.
Work is continuing on the control room and the lighting. Control panels for the sound and lighting are high tech!

Page One   +   Home Page   +   Page Three