November 19, 2002 Building Pictures   Page Two

Work is continuing on the baptismal font. The wooden canopy is ready for staining.  Glass will be installed above the outer wall of the baptismal area.  The Holy Oils will be displayed in a niche to the left of the baptismal font in this picture. The wood for many other areas of the church is being installed.

I apologize for the fuzzy pictures.  I was trying a newer digital camera.

EME and lector training, Nov. 19 - new camera and at low light the images were blurry - sorry. Choir
Ambo, has built in step, shelf.  Stations of the Cross have been cleaned and remounted on beautiful wooden frames.  Seven Stations will be mounted on each of the back walls.
Reconciliation Room - under construction. Reconciliation room.
   

To Page Three   +   Home Page